An office founded by two civil engineers in Ankara, now a 46-person engineering and project management team.

Numbers at the desk, responsibility on site
We started in 2004 as two civil engineers with the structural design of a single school. It still stands and we visit it once a year.
Today we are 46: 31 engineers, 6 technicians, a BIM and reporting team. More than 140 buildings in six provinces, 1.2 million m² in total. The team that calculates is the team that signs on site.
One promise to every client: a report every week, same time, same format. Surprises belong in the report, not on site.
Floor by floor
- +16.002026
Three sites at once: Gebze, Bursa, İzmir.
- +12.802023
Kızılırmak Valley Viaduct handed over.
- +09.602018
BIM unit; move to ISO 19650.
- +06.402013
Project management unit; first hospital.
- +03.202009
Building inspection licence; first supervision job.
- ±0.002004
First office in Çankaya. First job: a 16-classroom school.
Project team
The names in the proposal are the names on site. Every engineer’s registration is public.
Haluk ErtemFounding partnerİMO sicil 18342RC and earthquake engineering30 years on site; lead engineer on viaducts and hospitals.
Selin AksoyProject managerİMO sicil 31507 · PMPProject and construction managementClient representative on hospital and housing projects.
Emre TuncelStructural and BIM coordinatorİMO sicil 35870Steel structures, BIMSteel industrial buildings and multi-discipline model coordination.Certificates
Quality, environment, safety and BIM information management certificates; building inspection licence.
- ISO 9001:2015Quality management systemTSE · valid: 2028
- ISO 14001:2015Environmental management systemTSE · valid: 2028
- ISO 45001:2018Occupational health and safety managementTSE · valid: 2027
- ISO 19650BIM information managementBSI · valid: 2027
- YD-A 1124Building inspection licenceMinistry of Environment, Urbanisation and Climate Change
From the client’s logbook
Annex block
The hospital never closed for a day. The weekly report told us what was happening on site without a single extra meeting.
Nilüfer Park Residences
They checked every progress payment against quantities; for the first time we knew what we were paying for.
Gebze plant
They followed the crane runway details from shop drawing to erection. Not a single bolt hole was reamed on site.
Put your project on the table
Tell us the building type, area and stage; we reply within three working days with scope, duration and a written quote.