Steel roof trusses going up

Engineering · project management · inspection

From foundation to top level.

Structural design, site management and inspection from one team. Since 2004, more than 140 buildings in six provinces.

Gebze · industrial plantSteel roof trusses going up

+22.80

How a building rises

The programme of a typical 9-storey RC building. Tap a bar to see what happens on site at that stage.

6 weeks
26 weeks
10 weeks
40 weeks
12 weeks
Drilling rig and engineers taking soil samples
Investigation and excavationBoreholes, SPT and shoring. The foundation type is fixed by this report.
+31.50

Project team

The names in the proposal are the names on site. Every engineer’s registration is public.

NameTitleChamber / reg.Focus
Haluk Ertem — Founding partnerHaluk ErtemFounding partnerİMO sicil 18342RC and earthquake engineering30 years on site; lead engineer on viaducts and hospitals.
Selin Aksoy — Project managerSelin AksoyProject managerİMO sicil 31507 · PMPProject and construction managementClient representative on hospital and housing projects.
Emre Tuncel — Structural and BIM coordinatorEmre TuncelStructural and BIM coordinatorİMO sicil 35870Steel structures, BIMSteel industrial buildings and multi-discipline model coordination.
GYGökhan YamanGeotechnical engineerJMO sicil 9214Site investigation, shoringDrilling programmes, shoring design and deep excavation monitoring.

Certificates

  • ISO 9001:2015Quality management systemTSE · valid: 2028
  • ISO 14001:2015Environmental management systemTSE · valid: 2028
  • ISO 45001:2018Occupational health and safety managementTSE · valid: 2027
  • ISO 19650BIM information managementBSI · valid: 2027
  • YD-A 1124Building inspection licenceMinistry of Environment, Urbanisation and Climate Change
+38.50

From the client’s logbook

Annex block

The hospital never closed for a day. The weekly report told us what was happening on site without a single extra meeting.
Dr. Murat KılınçDeputy chief physician, Kayseri City Hospital

Nilüfer Park Residences

They checked every progress payment against quantities; for the first time we knew what we were paying for.
Aylin DemirtaşCooperative chair, Nilüfer Park

Gebze plant

They followed the crane runway details from shop drawing to erection. Not a single bolt hole was reamed on site.
Serkan ÖztürkInvestment director, Marmara Döküm
+48.00

Put your project on the table

Tell us the building type, area and stage; we reply within three working days with scope, duration and a written quote.