+03.20Discipline
Site supervision and building inspection
Rebar, formwork and scaffold checks before every pour; sampling, laboratory follow-up and recorded inspections.

A concrete pour cannot be undone, so before every pour we check rebar spacing, cover, formwork and scaffolding on site and record it.
We sample fresh concrete and follow the lab results; welds, bolts and pressure tests are in the plan too.
+12.00
Floor by floor process
Stages rise from the bottom up, like a building.
- +09.60Close-out
Lab results, non-conformities closed.
- +06.40Sampling
Fresh concrete tests and specimens.
- +03.20Pre-check
Rebar, formwork, scaffolding; record.
- ±0.00Inspection plan
What, when and who checks.
+20.00
Built with this discipline
+48.00
Put your project on the table
Tell us the building type, area and stage; we reply within three working days with scope, duration and a written quote.
