+03.20Discipline

Site supervision and building inspection

Rebar, formwork and scaffold checks before every pour; sampling, laboratory follow-up and recorded inspections.

Site supervision and building inspection

A concrete pour cannot be undone, so before every pour we check rebar spacing, cover, formwork and scaffolding on site and record it.

We sample fresh concrete and follow the lab results; welds, bolts and pressure tests are in the plan too.

+12.00

Floor by floor process

Stages rise from the bottom up, like a building.

  1. +09.60Close-out

    Lab results, non-conformities closed.

  2. +06.40Sampling

    Fresh concrete tests and specimens.

  3. +03.20Pre-check

    Rebar, formwork, scaffolding; record.

  4. ±0.00Inspection plan

    What, when and who checks.

+48.00

Put your project on the table

Tell us the building type, area and stage; we reply within three working days with scope, duration and a written quote.