What does BIM clash detection save on site?

Seeing a duct hit a beam on screen is far cheaper than seeing it on site.

Engineers reviewing a building information model on screen

Disciplines are drawn in separate offices and first meet on site. BIM moves that meeting to the screen.

Weekly federation

Models merged weekly; clashes listed.

Priorities

Not every clash matters.

Close-out

Each clash owned until closed.

Share WhatsApp LinkedIn X Facebook
Author

Emre Tuncel

Engineer · Tekton Engineering

From the Tekton Engineering team.