
−24.50Transport · İzmirOn site
İzmir Narlıdere Metro Station
A cut-and-cover station at level −24.50: geotechnics, shoring and BIM coordination.
In high groundwater, we run the site investigation, shoring design and BIM coordination for a cut-and-cover station down to −24.50; inclinometer readings are reported weekly.
+09.00
Construction programme
Stages and durations; bars scaled in months.
Investigation
Diaphragm walls
Excavation and slabs
Internal structure
Systems
+48.00
Put your project on the table
Tell us the building type, area and stage; we reply within three working days with scope, duration and a written quote.

