+38.40Healthcare · Kayseri
Kayseri City Hospital Annex
A 420-bed annex: project management and inspection, delivered in 26 months.
We managed and inspected a 420-bed annex built next to a working hospital, with site logistics through two separate gates so hospital traffic never stopped.
The base-isolated foundation uses 312 lead-rubber bearings, each installation recorded.
+09.00
Construction programme
Stages and durations; bars scaled in months.
Excavation and shoring
Isolated foundation
RC frame
Facade
MEP and finishes
Testing and acceptance
+48.00