A 640 m post-tensioned box-girder viaduct with 62 m piers: structural design and site supervision.
We designed and supervised the viaduct crossing the valley in eight spans; piers by slipform, deck by balanced cantilever.
+09.00
Construction programme
Stages and durations; bars scaled in months.
Investigation and piles
Piers (slipform)
Deck (balanced cantilever)
Surfacing and fittings